| Glass color | Transparent |
| Glass door thickness | 6mm |
| Aluminum profile color | Dark Brushed |
| Bottom tray color / skirt apron | White / Two-sides & double-skirt |
| Total rated power/Supply Current | 3.1kw/ 13.5A |
| Door style | Two-direction opening & sliding door |
| Flow rate of drainer | 25L/ min |
| Package quantity | 2 |
| Total package volume | 1.515m³ |
| Package way | poly bag+ carton + wooden board |
| Transportation Weight(Gross Weight) | 213kgs |
| 20 GP / 40GP / 40HQ loading capacity | 16sets /34sets /42sets |
Steam room with acrylic bottom tray Alarm system Glass shelf Ionizer FM radio Fan Folding acrylic stool Time /temperature setting Roof lighting & colorful LED light Bluetooth phone answering & music player Top shower & hand shower & back nozzles & side nozzles Hot/cold exchange mixer Steam generator cleaning Double steam outlet Aluminium door handle Wood-plastic floor (optional)
18.Top light 19.Dual-layer rack 20.Control panel 21.Tmperature sensor 22.Right fixed glass 23.Upper guide aluminum 24.Front & fixed glass 25.Front glass door 26.Side nozzle 27.Left column aluminum 28.Steam box 29.Down quide aluminum 30.Right & fixed glass 31.Right glass door 32.Handle 33.Right column aluminum


1.Top spray 2.Top cover 3.Horn 4.Ozone 5.Shower head 6.Lift shower support 7.Function conversion switch 8.Hot / Cold water switch 9.Cleaning cover 10.Back nozzle 11.Shower chain 12.Shower head water supply connection bas 13.Acrylic stool 14.Left fixed glass 15.Water drainage device 16.Bottom tray 17.FanThe picture shows a left side spare part; Please refer it symmetrical ly if you choose a right side part. Rated parameters for power sockets: 220V-240V~50Hz/60Hz.power socket cords:>2.5mm2. Remarks:Earth Leakage Protector 32 ampere should be installed on power supply wire.The picture shows a left side spare part; Please refer it symmetrical ly if you choose a right side part.The zero line , live line , and grounding line of indoor power sockets have to be in strictcompliance with standard configurations Prior to connecting hot and cold water pipes , please connect the corresponding pipeson the backplane , and secure them